Food and Fuel - Renewable Energy
Building Energy Improvements and Renewable Energy
04/19/2010 Design Commenced
05/24/2010 Construction Commenced
06/23/2010 first panel installed:
(Stephen A. Smith, Executive Director / Southern Alliance for Clean Energy)
07/08/2010 last panel installed
(Kimberly S. Greene, Group President of Strategy & External Relations and John G. Trawick, Sr. Vice President / Tennessee Valley Authority)
07/12/2010 Commission
08/12/2010 10:30AM Eastern, 1 MW Ribbon-Cutting
(Installation of the 2,000,000th SHARP Solar Panel manufactured in Memphis Tennessee)
Tags:
Comment
Comment by Paul Berney on September 13, 2010 at 5:07pm
© 2012 Created by Harvey Abouelata.
Powered by
.
You need to be a member of Food and Fuel - Renewable Energy to add comments!
Join Food and Fuel - Renewable Energy